Delivery depends on complexity and current capacity.
Standard: 15-25 working days. Size/film/filling config.
Custom: 30-45 days. 3D simulation, new tooling, FAT.
Turnkey Line: 45-70 days. Multi-machine integration.
Express: 10-15 days. Pre-engineered modules.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2026 Tradevv.com. All rights reserved.